• 17831-03 Students First Center Owner's Agent

    CENTRAL WASHINGTON UNIVERSITY:  STUDENTS FIRST CENTER OWNER’s AGENT 

    CWU Contract No. 17831-03

    Addendum #1: Revision to due date and selection dates 

     

    SUBMITTAL DEADLINE AND INSTRUCTIONS 

    Response Date: 3:00 PM PST, Ellensburg, WA local time, Wednesday, October 7th , 2026 

    Qualifications will be received by Central Washington University (CWU) from consultants interested in providing Owner’s Agent services for the Students First Center.  Services are expected to include PRC (Project Review Committee) preparation & coordination, PRC interview coordination, assisting with Design-Build team selection, Program verification coordination, GMP (guaranteed maximum price) contract development.   

     

    Project delivery is anticipated to be progressive design-build. 

    Building History: 

    Existing Bouillon Hall was constructed in 1961 as a new library building.  The building is named after Victor J. Bouillon who served as a trustee from 1932 to 1964.  Designed by acclaimed Seattle architect Fred Bassetti in the Mid-Century Modern Style, the rectangular, two-story structure won the 1961 Honor Award from the Washington State American Institute of Architects.  By 1965, library services had outgrown the building, and planning began for a replacement building.  In 1976, Brooks Library was completed, and Bouillon Hall vacated and has served to house multiple academic and support functions including Math, Communication, Computer Science, the CWU TV station, DSS, HR, IS, Testing, and Student Services. 

    The 72,504 gsf building underwent ACM abatement and major renovation in 1994 followed by extensive upgrades in 2016.  

    A pre-design was completed in June 2026 by Integrus Architects. 

     

     

    General Building Scope:  

    This request will create a building addition and partial renovation of Bouillon Hall to establish a centralized, student-focused entry point that streamlines enrollment for prospective students and improves access to critical services that support retention and completion. By co-locating key functions in a cohesive and accessible space, the project will enhance operational excellence, reduce barriers, and advance student success. Key features should include collaboration spaces, flexible work areas, general presentation, and on-boarding space such as large gathering space for group engagements.  

      

    The Capital Budget specifications of this project include:   

    • $53.9M funding request to the State of Washington Office of Financial Management.   
    • Programming sufficient to meet the needs of the Students First Center  
    • Massive overhaul of curb appeal and welcoming entrance to the east parking lot side of the building  
    • Respectful consideration for the historic nature of the building  
    • This facility will not include any general classrooms.  

     

    We are seeking consultants with an established record of excellence in progressive design-build project delivery, acting as an owner’s agent, programming, contracting, program verification coordination, construction documentation review, PRC (Washington State Project Review Committee) experience, with a strong background in institutional university facilities, university welcome/collaboration/success facilities, sustainability, and employment of OMWBE certified sub-consultants. 

    At the discretion of the University, firms that are not physically located in the State of Washington will be required to affiliate with a qualified, in-state firm acceptable to the University. 

    Information regarding CWU’s Design and Construction Standards (DACS) are available here: 

    Design and Construction Standards (DACS) | Central Washington University 

    For project information and required submittal information contact:  

     

    Delano Palmer, Director of Capital Planning & Projects or 

    Joanne Hillemann, Senior Architect 

    Central Washington University 

    400 E. University Way 

    Ellensburg, WA 98926-7523 

    1. (509) 963-2909

    delano.palmer@cwu.edu 

    joanne.hillemann@cwu.edu 

     

    CONSULTANT SCOPE OF WORK 

     

    Phase 1: Pre PRC approval 

    • Consultant will provide advisory review & recommendations on the preparation of PRC submittal content 
    • Consultant will be responsible for coordinating with the CWU Team in preparation for the PRC interview when the date is confirmed with the PRC. 
    • Consultant will participate in the CWU interview with PRC on the proposed project. 

     

    Phase 2: Post PRC approval and based on whether the project is funded by the State of Washington. 

    • Consultant will provide coordination with CWU on the development of Design-build RFQ and participate in the selection process. 
    • Consultant will coordinate with CWU on developing the terms of the Design-build contract for the “Program Verification” stage of the project. 
    • Consultant will provide advisory recommendations as necessary for the completion of the Program Verification stage of the project. 
    • Consultant will coordinate with CWU on the review of the GMP and preparation of the design-build contract. 
    • Consultant will coordinate with CWU on the selection of subconsultants and subcontractors with the selected design-build firm, as well as OMWBE participation goal strategies. 
    • Consultant will develop recommendations on an Owner Contingency management plan for the remaining scope of the project. 
    • Consultant will develop recommendations on project risk management and mitigation tactics for the remaining scope of the project. 

     

     

    SUBMITTAL DETAILS 

    The University is requiring electronic submittals of the items listed below for this solicitation. Hard copy submittals will not be accepted.  Submissions must be electronically delivered to joanne.hillemann@cwu.edu & delano.palmer@cwu.edu  prior to 3:00 PST on the date scheduled.  Since CWU limits incoming email to 7 Mb, submissions should be made via zip file, drop box, cloud download or similar means. 

    1. The electronic submittal shall use this subject line: “CWU Project No. 17831-03 Students First Center Owner’s Agent – Due October 7th, 2026, before 3:00 PM PDT 
    1. Please limit file size to 20MB. 
    1. The University will use the time stamp on the submittal upload to determine timeliness. 
    1. Proposers are responsible for ensuring timely delivery of submittals. 
    1. The University is not responsible for Finalists’ technical difficulties in submitting electronically. 
    1. Late submittals will not be evaluated. 
    1. Submittal format requirements: 
    1. Formatted in a single searchable PDF. 
    1. Include searchable bookmarks for each section of the Qualification, corresponding to the section’s outline in Selection Search Criteria. 
    1. Organized in accordance with the RFQ. 
    1. Submittals are encouraged to be under forty (40) pages, not including appendices. A “page” is defined as, when printed, a one-sided single sheet of 8.5 x 11 paper, unless the instruction specifically allows a larger sheet of paper. 
    1. The font should be no smaller than 10 point. 

    Any addenda issued for this RFQ will be published at the following website address:   

    https://www.cwu.edu/about/offices/facilities/capital-planning-projects/rfq-general-conditions.php   

     

     

    Consultants are responsible for checking the website for any addenda prior to submission of Qualifications. If you are unable to download the addenda, you may contact the individual noted above. 

     

    SUBMITTAL REQUIREMENTS 

    • Letter of interest 
    • Company profile/brochure illustrating Owner’s Agent capabilities. 
    • List a minimum of two and up to six projects that demonstrate a mix of Alternative project delivery (progressive design-build) and owner’s agent experience that have been led by your firm or successfully completed by your firm, with client references. Please note your experience with renovations, brownfield sites and greenfield sites.  References should include client names, titles, telephone numbers, and emails. Lists should include: 
    • project name 
    • project budget 
    • project location 
    • project start and completion dates 
    • website (if applicable) 
    • listing of project aspects similar to this project 
    • Project lead for your firm?  
    • Qualifications of consultant members (including sub-consultants) that will perform duties on this project, anticipated responsibilities if selected, and up to two references per team member. References shall include firm, title, name, telephone number, and email. 

     

     

    SELECTION CRITERIA 

    • Qualifications and expertise of consultant(s) relating to experience acting as an Owner’s agent. 
    • Experience delivering Progressive design-build projects or alternate project delivery methods. 
    • Demonstrated experience with the successful acceptance of PRC (State of Washington Project Review Committee) project evaluations. 
    • Demonstrated knowledge and experience with higher education agencies, capital project delivery, stakeholder coordination, and public works contracting. 
    • Experience with the selection of Design-Build firms, program verification phase management, and GMP review. 
    • Demonstrated experience with coordination on the selection of OMWBE subcontractor and subconsultant selections and participation.  
    • Quality of consultant’s service received by previous clients - including CWU & other higher education institutions. 
    • Key personnel experience relating to reviewing design and construction documentation for projects of this type and complexity. 
    • Proximity of the consultant(s) to the project site. 
    • Ability to meet schedules. 
    • Availability and bandwidth for the proposed project. 

     

     

    SELECTION SCHEDULE 

     

    September 28, 2026 Advertise RFQ 

    October 7, 2026 Qualifications due 

    October 8-9th, 2026 Virtual selection Interviews

    October 12, 2026 Final selection and request for fee proposal

     

     

    SCOPE OF WORK SCHEDULE:  Phase 1 

    October 12 - 16, 2026 High level advisory review of PRC submittal  

    October 21 – Dec 2, 2026 Periodic coordination with CWU on PRC interview preparation  

    Dec 3, 2026 PRC interview (TBD based on PRC availability) 

     

    SCOPE OF WORK SCHEDULE:  Phase 2 – Dependent on PRC approval and State project funding. 

    Q1 2027 Consultant Fee proposal development for Phase 2  

    Q2 2027 (Funding dependent) Begin coordination with CWU on Phase 2 scope items.  Detailed schedule to be coordinated at time of contract negotiations. 

    July 1, 2027 Earliest Capital Funding available for the project. 

     

  • 17906-02 SURC Theatre Lighting Upgrade

    PROJECT DESCRIPTION: SURC Theatre Lighting updates at Central Washington University

    BID MANUAL
     

    SMALL WORKS ROSTER PROCEDURE:
    This campus project is being delivered using CWU’s Small Works Roster process. Contractors interested in bidding must be listed on CWU’s Small Works Roster and have a current Washington
    State Contractor's License. To register for the Small Works Roster, contractors must enroll at https://cwu.gob2g.com/
     

    ELECTRONIC BID OPENING:
    The electronic bid opening process shall consist of an email submitted to Gary Gleason, Gary.Gleason@cwu.edu and Rachel Ketter, Rachel.Ketter@cwu.edu . The email submission shall have
    the Bid Form (See Section 00 2000) attached in PDF format. The email with the Bid Form must be submitted prior to 2:00PM, Pacific Time, Thursday, August 20, 2026 upon receipt of the electronic
    bid, the CWU Project Manager will reply to the email address and acknowledge receipt of the Bid Form.
     

    BASE BID:
    The base bid amount the Contractor submits shall be to furnish all labor, supervision, materials, services, and equipment required for SURC Theatre Lighting in accordance with the Bid/Construction Documents.
     

    PROJECT SCHEDULE:
    August 3, 2026:                          Small Works Roster Contractors will be solicited by CWU to submit bids. 

     August 20, 2026:                      Bids must be received prior to 2:00 PM PST, Thursday, August 20, 2026.  

    November 30, 2026:               Project shall be completed by November 30, 2026.
     

    CWU CONTACT:
    Direct all questions regarding the project to Gary Gleason , at Gary.Gleason@cwu.edu, or (509)963-2470.
     

    SITE VISIT & PARKING:
    The pre-planned site walk through is highly recommended and scheduled for Tuesday August 11, 2026 at 9:30AM. Interested bidders can meet at the East Patio of the SURC, near the Wildcat Statue. The SURC is located at 1007 N Chestnut Street, Ellensburg, WA. Limited visitor street parking is available or daily passes ($6.00) can be purchased at brown ticket dispensers located throughout campus or pre-purchased online at https://www.cwu.edu/parking/ . Parking without a permit may result in receiving parking ticket that will not be reimbursed by the university.

  • 17962-01 SOS Archives Vinyl Flooring

    PROJECT DESCRIPTION:   This project consists of removal of existing vinyl flooring, cove base and transitions in areas marked on the floor plan. Prep of existing slab, Install of new Armstrong 52514 Jubilee White vinyl flooring, color matched cove base, and transitions.

    BID MANUAL

    SMALL WORKS ROSTER PROCEDURE:                          

    This campus project is being delivered using CWU’s Small Works Roster process.  Contractors interested in bidding must be listed on CWU’s Small Works Roster and have a current Washington State Contractor's License. To register for the Small Works Roster, contractors must enroll at https://cwu.gob2g.com/ 

    ELECTRONIC BID OPENING: 

    The electronic bid opening process shall consist of an email submitted to Joe Chanes, Project Manager, Joe.Chanes@cwu.edu and Rachel Ketter Rachel.Ketter@cwu.edu .  The email submission shall have the Bid Form (See Section 00 2000) attached in PDF format.  The email with the Bid Form must be submitted prior to 2:00PM, Pacific Time,  Thursday August 20, 2026 upon receipt of the electronic bid, the CWU Project Manager will reply to the email address and acknowledge receipt of the Bid Form.

    BASE BID:  

    The base bid amount the Contractor submits shall be to furnish all labor, supervision, materials, services, and equipment required for SOS Archives Building Vinyl Flooring Replacement in accordance  with the Bid/Construction Documents.   

    PROJECT SCHEDULE:       

    August 3, 2026:                 Small Works Roster Contractors will be solicited by CWU to submit bids.  

    August 20, 2026:               Bids must be received prior to 2:00PM PST, Thursday August 20, 2026.

    December 31, 2026:        Project shall be completed by December 31, 2026.

     

    CWU CONTACT:   Direct all questions regarding the project to Joe Chanes , at Joe.Chanes@cwu.edu, or (509)963-3000. 

     

    SITE VISIT & PARKING: 

    The pre-planned site walk through is highly recommended and scheduled for August 13, 2026 at 11:00AM.  Interested bidders can meet at our Jongeward office, conference room 116.  Jongeward is located on the CWU Ellensburg Campus, 205 E. 11th Avenue. Limited visitor street parking is available or daily passes ($6.00) can be purchased at brown ticket dispensers located throughout campus or pre-purchased online at https://www.cwu.edu/parking/ . Parking without a permit may result in receiving parking ticket that will not be reimbursed by the university.

  • 17858-01 - Electrical Grid Security Feeder 14 - RFQ

    REQUEST FOR QUALIFICATIONS (RFQ) Engineering and Permitting Services for Electrical Grid Security Feeder 14

    Central Washington University

    CWU Contract No. 17858-01 – Electrical Grid Security Feeder 14

     Following the Thursday, July 2nd 2026 RFQ submission, this project has been awarded to MW Engineers.  If you have further questions about the project, contact Gary Gleason, Gary.gleason@cwu.edu (509) 899-3889

     

  • 17548-01 Bouillon Hall Signage & Vinyl Fabrication & Install

    Request for Proposal (RFP)
    CWU Bouillon Hall Signage and Vinyl Fabrication and Install

    Contract 17548-01

    Prepared for: Central Washington University (CWU)

    Following the RFQ Submissions this project has been awarded to Image Mill.  If you have further questions about this project, Joanne Hillemann, Joanne.Hillemann@cwu.edu 509-963-2909

     

  • 17836-01 ECLC Flooring Replacement

    PROJECT DESCRIPTION:

    Upgrade of flooring to new LVP flooring in the CWU ECLC (Early Childhood Learning Center), in the spaces specified in Attachment A.

     BID MANUAL

     Following the Tuesday, June 16th, 2026 bid submission, this project has been awarded to Rockstar Floors based on the base bid and alternate selected by CWU.  If you have further questions about this project, contact Joanne Hillemann, Joanne.hillemann@cwu.edu 509-963-1012.

     

     

     

  • 17257-11: GEP1-2_3R Control Valve Install

    PROJECT DESCRIPTION:  See attached Project Documents

    BID MANUAL

     

    Following the bid submission this project has been awarded to Holt Services.  If you have any questions about this project contact Joe Chanes. Joe.chanes@cwu.edu, 509)963-3000. 

     

  • Campus Parking Lot Striping 17872-01

    PROJECT DESCRIPTION:  Parking Lot Striping

    BID MANUAL

    Following the June 18th bid submission, this project has been awarded to Northwest Asphalt.  If you have further questions about this project, contact  Dave Kopczynski David.Kopczynski@cwu.edu or 5089-899-5787.

     

  • 17640-01 CWU Sidewalk Concrete Repairs

    PROJECT DESCRIPTION: Demo and replace sidewalks throughout campus, as indicated within
    the bid documents.

     


    Following the Monday, December 22nd meeting, this project has been awarded to Western Excavating based on the base bid and alternate selected by CWU.  If you have further questions about this project, contact. Kallysta Ray, Kallysta.Ray@cwu.edu. or (509)963-1012.

  • 17598-01 Science 1 Chiller Replacement

    PROJECT DESCRIPTION: 

    The base bid amount the contractor submits shall be to furnish all labor, supervision, materials, services, and equipment required for Science 1 Chiller Replacement and demo and disposal of existing chiller and components.

    ADDENDUM 01:  10/09/2025

    Revised Base Bid Scope:

    Base bid shall assume the contractor shall utilize a crane for the removal and installation of mechanical equipment and shall include the cost of restoration of any landscaping impacted by the placement of crane pad, mobilization, safety considerations, construction, demobilization.

    Following the Thursday, October 16th bid opening, the contract has been awarded to Total Energy Management.  If you have questions about this project, contact Dave Kopczynki, Dave.Kopczynski@cwu.edu (509) 963-3305.                              

     

  • 17517-01 Aviation Degree Expansion

    REQUEST FOR QUALIFICATIONS (RFQ) Architectural & Engineering Services

    CWU Contract No. 17517-01 – Aviation Degree Expansion

     Project Overview

    Central Washington University (CWU) is requesting Statements of Qualifications (SOQs) from qualified architectural & engineering teams to provide architectural, engineering design, permitting, and construction administration services related to the Aviation Degree Expansion at Bowers Field in Ellensburg, WA. These services will include a preliminary Discovery program verification, permitting, architectural & engineering design, and construction-phase administration.

     Following the Thursday, September 11th  2025 submission, LMN +Corgan was selected for this project.

    Questions can be directed to david.kopczynski@cwu.edu & Delano.Palmer@cwu.edu. 

  • 17492-01 Campus Emergency Backup Power

    PROJECT DESCRIPTION:  

    Central Washington University is requesting Statements of Qualifications (SOQs) from qualified engineering teams to provide engineering design, permitting, and construction administration services related to the installation and CWU grid integration of three (3) 2MW generators. These services will include feasibility evaluation, Washington Department of Ecology permitting, electrical engineering design, and construction-phase administration.

    Following the Wednesday, August 13th, 2025 submission, MW Engineers was selected for this project.  Please contact Gary.Gleason@cwu.edu and Delano.palmer@cwu.edu for questions.

  • 17488-02 Brooks Library Roof Replacement

    PROJECT DESCRIPTION:  Brooks Library Roof Replacement to include: Inspection of all roof section for any soft spots in the insulation or structural damage prior to install of the new system. Any insulation or structural repair to be billed in addition to contract price. Preparation of the existing roofing system prior to installation of new coating system. Coat  entire roof with new system aside from horizontal TPO walking platform.

    CWU CONTACT:  Direct all questions regarding the project to Joe Chanes, Project Manager, at Joe.Chanes@cwu.edu, or 509-856-7107.

    17488-02 Project Manual Bid Documents 
    17488-02 Addendum #1 - 8/4/25 

     

    Following the Thursday, August 7th bid submission, this project has been awarded to Evolution Exteriors.  Direct all questions regarding the project to Joe Chanes, Project Manager, at Joe.Chanes@cwu.edu, or 509-856-7107.

     

  • 17485-01 Black Hall Roof Replacement

    PROJECT DESCRIPTION:  

    Black Hall Roof Replacement to include:  Inspection of all roof section for any soft spots in the insulation or structural damage prior to install of new system.  Any insulation or structural repair to be billed in addition to the contract price.  Preparation of the existing roofing system prior to installation of new coating system.  Install additional metal flashing at areas where metal roofing has a vertical change to reduce risk of leaking.

    17485-01 Black Hall Roof Replacement Bid Manual 

    Following the Tuesday, July 22nd bid submission, this project has been awarded to Evolution Exteriors.  Direct all questions regarding the project to Joe Chanes , at Joe.Chanes@cwu.edu, or (509) 963-1488.

     

  • 17456-02 Samuelson Data Center AHU Replacement

    PROJECT DESCRIPTION:  Replace the existing Air Handling Units. This work will be done in 2 phases. The first phase of work includes a new chilled water Air Handler Unit (AHU-1) with an alternate to add ductless split systems to the UPS room. The second phase of work is to be bid at a later date. Phase 2 scope includes replacing the second air handler with a DX cooled Air Handler Unit and Condensing unit (AHU-2 & CU-1).

    17456-02 Samuelson Data Center AHU Replacement Project Manual
    17456-02 Samuelson Data Center AHU Replacement Bid Set (REVISED)

    Following the Tuesday, September 9th Bid, this project has been awarded to Meek Mechanical. Direct all questions regarding the project to Joe Chanes, CWU Construction Project Manager, at Joe.chanes@cwu.edu (509)856-7107.

     

  • 17443-02 Brooklane Apts. Water Service Upgrade

    PROJECT DESCRIPTION:  Replace the existing water service to the Brooklane Apartments. This work will be done in East and West phases. The East phase of work includes the main road crossings as alternates and the water service branch connections to apartments as indicated in the attached contract drawings. Maintain the existing service to the apartments.

    17443-02 Brooklane Apts. Water Service Upgrade Project Manual
    17443-02 Brooklane Apts. Water Service Upgrade Drawings
    17443-02 Addendum No. 1 - 8/1/2025
    17443-02 Addendum No. 2 - 8/4/2025

    PUBLIC WORKS ROSTER PROCEDURE:  This campus project is being delivered using CWU’s Public Works Roster process. Contractors interested in bidding must be listed on CWU’s Public Works Roster and have a current Washington State Contractor's License.   CWU roster sign-up is available at https://cwu.gob2g.com

    ELECTRONIC BID OPENING:  The electronic bid opening process shall consist of an email submitted to Gary Gleason, Construction Project Coordinator, Gary.gleason@cwu.edu . The email submission shall have the Bid Form  (See Section 00 2000) attached in PDF format. The email with the Bid Form must be submitted prior to 2:00 PM Pacific Time, Wednesday, August 6, 2025. Upon receipt of the electronic bid, the CWU Construction Project Coordinator will reply to the email address and acknowledge receipt of the Bid Form.

    BASE BID:  The base bid amount the Contractor submits shall be to furnish all labor, supervision, materials, services, and equipment required to replace water piping in accordance with the Bid/Construction Documents.

    PROJECT SCHEDULE:  August 27, 2025: Project shall be Performed by 90 days after the notice to proceed has been given.

    CWU CONTACT:  Direct all questions regarding the project to Gary Gleason, CWU Construction Project Manager, at Gary.gleason@cwu.edu (509)899-3889. Copy questions regarding the project to David Johnson, MW Consulting Engineers, at Davidj@mwengineers.com (509)838-9020.

    SITE VISIT:  A pre-bid site visit is highly recommended. Schedule the visit with Gary Gleason.

    BID/CONSTRUCTION DOCUMENT CLARIFICATIONS AND PRODUCT SUBSTITUTIONS:  Any clarifications or product substitution requests to the Bid/Construction Documents must be submitted to the CWU Construction Coordinator and MW Consulting Engineers at least five (5) working days prior to the bid opening. Approval of proposed equals or substitutions will be made by addendum prior to receipt of bids and by a properly executed change order after receipt of bids.

  • 17435-01 ECLC Heating and Cooling Updates

    PROJECT DESCRIPTION:

    The purpose of this project is to complete a mechanical upgrade for the Early Childhood Learning Center (ECLC) Heating and Cooling on the Central Washington University (CWU) campus in Ellensburg, Washington. The project includes the demo and removal of 6 (six) hydronic heat fan coils, air conditioners, and water lines connecting to the boiler & capping, and with new Carrier DX Fan coils and Heat pumps. Scope includes all electrical disconnect, and Controls terminations for mechanical scope or work.

    Project Manual - Bid Documents

    Following the Tuesday, July 8th bid submission, this project has been awarded to CNL Construction.

    Direct all questions regarding the project to David Kopczynski, CWU Project Construction Coordinator, at David.Kopczynski@cwu.edu, or 509-899-5787.

     

  • 17350-01 SURC Carpet Replacement

    PROJECT DESCRIPTION:    
    Replacement of carpet within Student Union Recreation Center (SURC), and upper pit (lobby), vestibules 100B, 100A, and 100I, with carpeted area and ramp adjacent to 100I.

    Following the Thursday, June 26th bid submission & owner selection of alternates, this project has been awarded to M Sevigny.  Direct all questions regarding the project to Kallysta Ray, CWU Project Manager, at raykal@cwu.edu, or 509-963-1012.

  • 17295-02 CWU CAT Center Carpet Replacement

    PROJECT DESCRIPTION:
    Replacement of old flooring in the 4th floor of CWU Shaw Smyser per the attached documents.

    Following the Thursday, June 12th bid submission.  This project has been awarded to M Sevigny.   For questions on this project, please contact Joanne Hillemann, Senior Architect, at joanne.hillemann@cwu.edu. 

  • 17257-02 Computer Center Demolition

    PROJECT DESCRIPTION:

    The work consists of the demolition of the existing Computer Center building including hazardous material abatement, structure demolition (including slabs and foundations), utility capping and removal, and importing of material for backfill.

    Following the June 24th bid submission this contract has been awarded to Skycorp LTD.  For any information about this project contact Joe Chanes, CWU Project Manager, at joe.chanes@cwu.edu, or 509-856-7107

  • 16374-01 - Decarbonization Plan
    Project Description

    Central Washington University (CWU) is seeking qualified Engineering teams interested in providing engineering services for developing CWU’s Decarbonization Plan for the Ellensburg campus. Deliverables from this project will be used as supporting data for the 2025-2027 Capital Budget Request in September of 2024 and for the upcoming legislative requirements associated with HB1390.

    Following the Wednesday, September 27th, 2023 RFQ submission, this project has been awarded to McKinstry LLC.

    Questions about this project can be submitted to Jeremiah.Eilers@cwu.edu.

    Decarbonization Plan Notes (pdf)
  • 16307-01 - Arts Education Center Pre-Design

    Following the Wednesday, September 27th, 2023 RFQ submission, this project has been awarded to DLR Group.

    Questions about this project can be submitted to David.Kopczynski@cwu.edu.

  • 15712-05 Black Hall Renovation

    PROJECT DESCRIPTION:  

    The work consists of three sequential selective demo and interior alterations phases within the existing Black Hall. Areas outside of the construction boundary including future/past phases will be fully occupied during construction. The total area of all phases of interior alteration is approximately 17,300 SF.

     Following the Thursday, January 16th bid submission, this contract has been awarded to Garco Construction.  For any information about this project, contact Joanne.hillemann@cwu.edu. 

  • 15712-03 - CWU Multi-Cultural Center Design

    Following the Wednesday, July 12th RFQ submission, this project has been awarded to OPSIS Architecture.

    Questions about this project can be submitted to Joanne Hillemann Joanne.Hillemann@cwu.edu.

  • 14880-13 - North Academic Complex Construction

    Following the Tuesday, October 3rd, 2023, RFQ submission, this project has been awarded to Garco Construction.

    Questions about this project can be submitted to Joe.Chanes@cwu.edu.

CWU News

Campus Executive Chef Joe Ritchie delivers a food demonstration at The Farm.

Ellensburg has helped CWU’s Campus Executive Chef reach new heights

September 30, 2026 by

A banner for the Una Noche de Encanto concert

Encanto Arts residency at CWU to feature internationally acclaimed musicians

September 30, 2026 by

More News